Garo 1 Row 2 Showers 63A EV Charger Priority Distribution Board / Consumer Unit
Model: GM10-PS63
Garo 1 Row 2 Showers 63A EV Charger Priority Distribution Board / Consumer Unit
Model: GM10-PS63
-
£143.99 Inc VAT ( FREE UK Delivery On Orders Over £150* )
£119.99 Ex VAT ( FREE UK Delivery On Orders Over £150* )
Protect your main incoming supply with GAROs Priority & Non-Priority Boards. Effective and easy to install solutions to safely manage the load between multiple electric showers or an electric shower & EV Charger.
Garo Priority & Non-Priority Boards are designed to facilitate the use of multiple electric showers which are being supplied from a domestic single phase supply. These units can also operate in conjunction with other appliances, such as EV Chargers, Hot Tubs or Heat Pumps. These boards will disconnect a shower or other appliance, as required, in order to safely manage the total house load and protect the main fuse. All priority & non-priority products are fitted with type A RCBO/RCCB, which are suitable for electric showers up to 9.5KW & electric vehicle chargers with DC leakage protection.
PRIORITY - Allows an appliance (A) to be given priority of use over the second appliance (B). While device (A) is in operation appliance (B) will not receive power, even when switched on. While appliance (B) is in operation, should appliance (A) be switched on, it will then take priority, meaning appliance (B) is automatically disconnected.
KEY FEATURES
- Easy
to install & wire
- Compact
and well-designed unit
- Utilises
silent contactors
- Fully
compliant with 18th edition regulations
- Proven
reliability & comprehensive warranties
- Helpful
instructions, wiring diagrams & video guides available
- 18th
Edition Compliant
Additional Information
- Dimensions
(H x W x D) 235 x 227 x 110
- Board
Type: Main Switch
- Number
Of Circuits : 10 Way
- Current: 63
A
- Wattage: 200W